Site Name

  • Projects
    • Automotive
    • Aviation
    • Educational
    • Entertainment & Arena
    • Food, Freezer & Process
    • Health Care
    • LEED Certified
    • Office Buildings
    • Warehouse & Industrial
    • Utilities & Maintenance
  • Sustainability
  • Service Department
  • Contact
  • Health & Safety
  • Employee Log-In
  • Projects
    • Automotive
    • Aviation
    • Educational
    • Entertainment & Arena
    • Food, Freezer & Process
    • Health Care
    • LEED Certified
    • Office Buildings
    • Warehouse & Industrial
    • Utilities & Maintenance
  • Sustainability
  • Service Department
  • Contact
  • Health & Safety
  • Employee Log-In
Food, Freezer & Process

Customer: Adams Flavour Labs
Project: Manufacturing Addition
Location: Scarborough, Ontario
Constructor: Giffels Design-Build Inc.
Completed: 2004

This addition to Cadbury/Adams existing plant was required
to consolidate the flavour mixing operations and waste
disposal area to make room for additional process lines.

Customer: Continental Colloids
Project: Manufacturing
Location: Oakville, Ontario
Constructor: Giffels Design-Build Inc.
Completed: 2003

This 50,000 square foot production facility services the dairy
industry. Dry-mix food ingredients are combined and stored
before being shipped to companies such as Parmalat and
Nestle for use in ice cream, yogurt and other dairy production.

Customer: Hopewell
Project: Warehouse & Distribution
Location: Brampton, Ontario
Completed: 2002

As part of the continuing development of the Hopewell
Distribution Campus at Air-port Road and Highway 7 in
Brampton, Hopewell Logistics Inc. negotiated an agreement
to provide logistics services for Nestlé Canada Inc.

Nestlé’s current and future requirements are satisfied in a
new 540,000 square foot distribution facility, including
262,700 square feet of temperature-controlled space and a
40,000 square foot office area.

Janick Electric Ltd. design-build division is responsible for
the overall Electrical Design. This design includes the lighting
installation for a clear height of 30-feet to allow maximum
flexibility in product storage and lighting for the extensive
parking and significant trailer storage area.

This large project was fast tracked and was delivered
within a nine month schedule.

Customer: Lee Li International
Project: Manufacturing, Office
Location: Mississauga, Ontario
Constructor: Giffels Design-Build Inc.
Completed: 2001

This 108,000 square foot food processing plant can accommodate raw meat processing and fried food operations.

This project was fast-tracked for Lee Li, a division of Gallant Foods, completion of eight months from start of design to client occupancy.

PROJECTS-PROCESS-LEE-LI-IMAGE-1-e1479489597905

Customer: Millard Refrigeration
Project: Cold Storage, Warehouse
Location: Brampton, Ontario
Constructor: Giffels Design-Build Inc.
Completed: November 2004

The construction of this 245,000 square foot cold storage, warehouse and office facility in Brampton involved extensive high voltage work. Janick Electric designed a 4,000A service with provisions to double the size. This project entailed a significantly long primary duct bank with walk in manholes.

The building features underfloor electric heating system that has been designed to fit time of use billing. It also features CFIA complaint design, a VFD controlled evaporator system and hi/low metal halide lighting system with individual sensors for maximum energy savings performance.

MILLARD1
MILLARD2

Customer: Puratos Canada
Project: Manufacturing, Warehouse & Office
Location: Mississauga, Ontario
Constructor: Giffels Design-Build Inc.
Completed: 2006

This 75,000 square foot process plant and warehouse was
completed in March 2006. Puratos Canada partners with the
worlds finest bakers, patissiers and chocolatiers to find
solutions and develop products.

The electrical design and construction provided by Janick
Electric on this job involved the disconnection and relocation
of existing machinery intertwined with new machinery and
complete process wiring in a turnkey format.

PROJECTS-PROCESS-PURATOS-IMAGE-1-e1479489588938

Customer: Western Waffles
Project: Frozen Food Product Plant
Location: Brantford, Ontario
Completed: 2003

Western Waffles is the world’s largest manufacturer of private
label frozen waffles. The 130,000 square foot manufacturing
area is distinguished by its focus on extreme “cleanability” and
sanitation; all walls, ceilings and freezer panels can be
hosed down.

The freezing, baking and warehouse were designed to
accommodate state of the art food preparation requirements.
Janick Electric designed and installed complete process wiring
at this facility.

The design in the 8,000 square foot offices compliments the
architectural features including waterfalls and a granite slab floor.

The lighting was designed to accent those and other features
including sculptures and numerous pieces of artwork.

Western-Waffles-P1010010
Western-Waffles-1-2

1170 Sheppard Avenue West, Building A, Unit 9, Toronto, ON M3K 2A3
Tel: (416) 635-8989 Fax: (416) 635-8484

Copyright © Janick Electric Ltd. All rights reserved.