Customer: Ford Motor Company
Project: Tenant Upgrade
Location: Mississauga, Ontario
Completed: February 2015
Janick Electric Limited was responsible for providing a fast turnaround for tenant upgrade at this 220,000 square foot building. Ford Motor Company has leased 100% of this space.
This project involved upgrades from a Shell Warehouse to an upgraded facility complete with racking, an intensive battery charging setup and multiple main power positions for equipment as well as office upgrades.
This project was fast-tracked and complete tenant upgrade was provided in less than three months.
Customer: General Dynamics Canada
Project: Maintenance Facility
Location: Edmonton, Alberta
Completed: 2007
General Dynamics Canada is a secure access facility for maintenance work on military grade vehicles.
The Janick Electric team designed and constructed this facility complete with process and machinery wiring.
This project involved very high security clearance and was approximately 30,000 sq ft in size.
Customer: Hitachi
Project: Office
Location: Mississauga, Ontario
Completed: 2003
Hitachi developed a new centralized location for office staff
and sales teams. The sales division has on site demonstration
capabilities with sophisticated demonstration lab equipped
with in floor power distribution system, decorative lighting
and high end communications.
The office was built to adhere to energy efficient standards.
Janick Electric is proud to be the design builder for this project.
Customer: Jancox Stamping
Project: Stamping Plant
Location: Brampton, Ontario
Completed: 1999
In late 1999, Jancox Stamping, a major supplier of high
quality metal and plastic parts to the auto industry,
wished to relocate its stamping plant from Etobicoke
to a more strategic location in Brampton.
Janick’s electrical team completed the design and
installation on time and on budget. The facility was
modified to meet Jancox’s requirements. In addition
to the design and construction of the facility,
Janick’s industrial process group designed and
installed the electrical process power to optimize
manufacturing efficiency.
The 84,667 square foot facility is 24’-0” clear,
equipped with a 20-ton crane, process bus duct
servicing stamping presses, and pulse start
metal-halide lighting.
Customer: KTH Manufacturing Inc.
Project: Welding & Stamping Plant
Location: Shelburne, Ontario
Constructor: Giffels Corporation
Completed: Eight Phases of Expansion 1998-2007
This 354,000 square foot manufacturing plant is a Tier-1 automotive supplier for under-body structural parts, providing components to companies worldwide. Some of the key elements that make up this facility include presses, die and coil handling, overhead cranes, underfloor scrap conveyors, scrap loading facility, and welding operations.
Janick Electric Ltd. provided design and construction for such special systems as compressed air, plant power distribution for automatic welding equipment and incoming power supply and transformation. The overall electrical project value is $4,300,000.00.